The existing boiler has been maintained to serve the Church.īuilding services were installed by Ellison Energy and the main contractor was Baum Construction Management. The boilers serve steel panel radiators throughout the existing Crypt area, the newly modified areas and the new extension which has been added to the side of the Crypt and Church.Īdditional efficiencies have been achieved by locating the boilers in a new plantroom nearer to the radiator circuits, which has reduced the amount of distribution losses. ![]() In addition they are very efficient with fanned flues.' The two Paramount two 95kW boilers were selected by KSP Consulting and a spokesman commented, 'As space within the Crypt is very limited we chose the Paramount two boilers because they are high output, compact and are wall mounted. This project has been made possible thanks to donations from charitable trusts, companies, private individuals and the Government's Homes and Communities Agency which has granted almost £1million to the project. The new facilities include a number of individual bedrooms, a new reception area, modern training rooms for personal and life skills, a residents' lounge and an expanded and refurbished restaurant with a new kitchen. A £1.5million redevelopment at the Crypt's main site at Great George Street, Leeds has provided refurbishment of the existing facilities, together with an extension.
0 Comments
Leave a Reply. |